PREFABRICATED FLOOR CONSTRUCTION

The following video of the manufacturing process and installation on the Australand “The Green” project shows how prefabricated floor panels, topped with factory pre-installed flooring can speed up construction. Australand achieved an 11-day turnaround per level using Tecpro Smartfloor cassettes and prefabricated wall frames.