SAVE TIME ON SITE WITH PREFABRICATED FLOOR CONSTRUCTION

Frasers Property “The Green” project shows how prefabricated floor panels, topped with factory pre-installed flooring can speed up construction. They achieved an 11-day turnaround per level using TECBUILD Smartfloor cassettes and prefabricated wall frames.